Crushed Stone Calculator: Cubic Yards, Tons & Cost

Driveways · Paths · Aggregate base

Crushed Stone Calculator

Calculate crushed stone in cubic yards, US short tons and metric tonnes. Allow separately for a compacted finish, extra material and optional delivery costs.

1. Enter your project measurements

Enter the target installed depth, not the loose delivered depth.
2. Choose stone and ordering allowances
Editable planning value, not solid-rock density.
0 by default. Enter your supplier/contractor’s recommended extra loose volume.
For spillage, irregular grading and measurement uncertainty.
Illustrative payload capacity. Confirm legal loading limits.

Density is a planning placeholder. Verify the quarry’s loose bulk density and product grade.

3. Optional price estimate
Enter US dollars (USD) for all charges.

How to estimate crushed stone

Measure the surface area and the planned installed depth. Multiply area by depth to find the required finished volume. If your contractor expects the material to settle or compact, add an optional loose-volume allowance. Add the separate waste allowance to reach your proposed order volume.

Convert that order volume to weight using your supplier’s loose bulk density, not the density of solid limestone or granite. Crushed stone often contains voids between particles, and the delivered bulk density depends on its source, grading, moisture and handling.

Formulas used

  • Rectangle area = length × width.
  • Circle area = π × (diameter ÷ 2)².
  • Triangle area = base × perpendicular height ÷ 2.
  • Finished volume = area × installed depth.
  • Loose volume = finished volume × (1 + compaction allowance ÷ 100).
  • Order volume = loose volume × (1 + waste allowance ÷ 100).
  • Weight in kg = order volume in m³ × loose bulk density in kg/m³.
  • US short tons = kilograms ÷ 907.18474.

Example: crushed stone for a driveway

A 30 ft × 12 ft driveway with a 4-inch finished stone layer needs 120 cubic feet, or about 4.44 cubic yards of installed stone. At a user-chosen 15% loose-volume compaction adjustment and 5% additional waste, the ordering estimate is approximately 5.37 cubic yards. These percentages are examples, not universal recommendations. Supplier specifications should determine the actual factors.

Planning densities (editable)

AggregateIllustrative bulk density
General crushed stone1,600 kg/m³
#57 stone1,500 kg/m³
Crusher run / dense base1,750 kg/m³
Crushed limestone1,550 kg/m³
Crushed granite1,650 kg/m³
Screenings / stone dust1,700 kg/m³
Recycled concrete aggregate1,450 kg/m³

These figures are illustrative presets only. Actual supplier product density overrides all values above. Aggregate size labels such as #57 and crusher run describe grading, not one consistent density or compaction response.

Frequently asked questions

How many cubic yards of crushed stone do I need?

Multiply area in square feet by the finished depth in feet, then divide the resulting cubic feet by 27. Apply your supplier’s recommended loose-volume factor and any extra waste if required.

How many tons are in one cubic yard of crushed stone?

There is no fixed weight. At the calculator’s illustrative density of 1,600 kg/m³, one cubic yard weighs about 1.35 US short tons. Other grades, moisture conditions and quarries yield different values.

Is #57 stone the same as crusher run?

No. #57 stone is generally a graded coarse aggregate; crusher run or dense-graded base normally contains fines. Confirm the exact product specification because naming differs by region and supplier.

What should I enter for compaction?

Enter 0% unless you have a project-specific expected loose-volume adjustment. Compaction is not a universal percentage. Dense graded bases can change volume significantly with rolling, while open-graded clean aggregate behaves differently.

Can I calculate 50 lb bags or truckloads?

Yes. The tool divides estimated ordering weight by the entered bag weight or truck capacity and rounds up. Actual supplier bag yield and permitted vehicle payload can differ.

Does this include delivery and labor costs?

You can enter material unit price and a fixed delivery charge. The result does not automatically include tax, installation labor, excavation, geotextile, equipment or permits.

Planning estimate, not a supplier quote. Confirm grades, compaction, bulk density and truck loading with your local quarry or contractor. For engineered bases, retaining walls, drainage systems and structural work, follow the applicable design specifications. See the calculation methodology and disclaimer.